Rosewood Maldives Resort artificial thatch implementation plan
Rosewood Maldives Resort artificial thatch implementation plan
I. Project background
Rosewood Hotel, an internationally renowned luxury hotel brand, is the first to enter the Maldives, aiming to create a resort that blends local nature with high-end luxury experiences. Maldives attracts global tourists with its charming beaches, blue waters and unique tropical scenery, and artificial thatch, as a kind of building material that can reflect tropical style and has many practical advantages, will be used in the construction of resort hotels, creating an original ecological and luxurious holiday atmosphere for guests.
Second, artificial thatch choice
Material characteristics:

The artificial thatch made of environmentally friendly plastic has a more real texture, close to the appearance of real thatch, which can perfectly integrate into the natural environment of Maldives. This material is 100% fireproof, in line with the hotel fire safety standards, and is not threatened by bird nesting, insects, fungi and other threats, greatly reducing the maintenance cost. At the same time, it can be matched into a variety of thatch colors, such as the commonly used dark yellow, light yellow, etc., with the passage of time, the color is more and more realistic, which can show the beauty of the precipitation of years.
Classification and specifications:
The use of layer tiles, the length of 200-220mm, diverse styles, can achieve fluffy, messy, neat, straight line and other different paving effects, to meet the needs of different architectural styles of the hotel. The finished product specifications are 50cm x 50cm, which is convenient to install, time-saving and easy to spread evenly by workers, and effectively saves installation costs.
Third, construction scheme
Preliminary preparation: Construction is carried out on the roof where the waterproof layer and protective layer have been constructed. After the waterproof layer of the roof is made, the water seepage test is carried out first to ensure that there is no leakage problem. After qualified, the roof magnesium resistant plate is installed, and the water seepage test is carried out again after the plate is installed to double guarantee the waterproof performance of the roof. After that, reserve installation positions such as lightning rods and lighting on the roof to prepare for subsequent installation of electrical equipment.
Installation process: The thatch tiles are laid from the eaves from the bottom to the top, similar to the conventional tile laying method. When installing, pay attention to the overlap between the tiles to ensure that there is a certain anti-rain effect, although the artificial thatch has a certain anti-rain ability, but the hotel roof still needs to do a professional waterproof layer to cope with the rainy weather in Maldives. During the installation process, workers should strictly follow the operating specifications to ensure that the tiles are firmly fixed to avoid falling off the tiles due to natural factors such as sea breeze.
4. Cost budget
Material cost:
The price of artificial thatch is 100-300 yuan /㎡, according to the total area of the hotel building roof, the material cost is expected to be about [X] yuan. Although the price of artificial thatch is higher than that of natural thatch, it is a more economical option in the long run given its low long-term use and maintenance costs.
Construction cost:
To hire a professional construction team, according to the difficulty and duration of construction, the estimated construction cost is [X] yuan. The construction team should have rich experience in thatch roofing construction and be familiar with local building codes and climatic conditions in Maldives to ensure construction quality and progress.
5. Quality and maintenance
Quality control:
In the material procurement process, strictly screen suppliers to ensure that the quality of artificial thatch meets relevant standards. During the construction process, professional supervision personnel are arranged to supervise and inspect each process, such as roof waterproof treatment, plate installation, thatch tile laying, etc., to ensure that the construction quality meets the design requirements.
Maintenance measures:
there is no need to carry out fire and insect prevention treatment after installation of artificial thatch, and it is simple to maintain later maintenance. Only need to wash with water regularly to remove impurities such as dust on the surface, so as to maintain its beauty and performance. Check the roof regularly to see if there are problems such as loose tiles, and repair it in time to ensure the safety and beauty of the hotel building.